UJJAIN, MADHYA PRADESH
Published
Jun 23, 2025 at 3:30 PM
Bid Submission Start
Jul 14, 2025 at 3:30 PM
Bid Submission End
Jul 24, 2025 at 3:30 PM
Bid Opening
Jul 25, 2025 at 3:30 PM
Development of Ujjain-Jaora Access Controlled Greenfield Highway including Ujjain spur connectivity as 4-Lane with Paved Shoulder (Design length - 98.73 km) in the State of Madhya Pradesh on Hybrid Annuity Mode.
